PROJECTS

Creek Damage Repair After Cyclone Debbie

In 2017, Cyclone Debbie raged through Queensland, causing immeasurable damage. In particular, Cyclone Debbie caused immense destruction to the ITV Studios lot, which significantly hindered many of their projects. The team at Total Environmental Concepts were brought in to repair the damage to the surrounding creeks and natural landscape.

Read What Happened?

In March of 2017, Tropical Cyclone Debbie landed and swept destruction through Queensland, destroying a significant amount of surrounding landscape and impacting filming schedules.

There were two creek areas in particular that needed repairing, and due to upcoming projects, the timeline to have this completed was relatively short.

 

What Was Done?

The repair work was completed in four stages.

The first stage took into consideration work that was done upriver from the already-present bridge. Approximately 2000 tonnes of river rock needed to be removed, and 20 tonnes of imported rock groins needed to be placed. These rock groins were intended to redirect the water. This stage also included the placement of logs in the creek bank, and the removal and construction of a new bridge.

creek damage repair gold coast

In the second stage, Total Environmental Concepts was tasked with restoring Trails Lake, a concrete creek pool, to its original condition by removing the accumulated bed material. The flooding caused by Cyclone Debbie moved significant quantities of bed material into the pool. Erosion downstream of the pool crest wall also developed since floods from 2013.

The accumulated bed material – silt, gravel and larger cobbles – were removed by a small excavator and by hand as the concrete lining is fragile. A pump located upstream released low-flor water around the works site to below the crest wall.

3000 tonnes of the silt and river rock material that flooded Trails Lake was removed and onsite creek rehabilitation works repaired the damaged area. This proved challenging as the palm trees provided small working space.

In stage three, Total Environmental Concepts was engaged to stop the erosion of the righthand bank downstream of the Trials Lake Crest wall. The team needed to create a constructed cascade to convey water from the Trials Lake to the natural channel downstream and, in doing so, repair the current erosion that undercut the right-hand crest wall of the lake.

The bank revetment was done using graded quarry rock with a geofabric underlay. The bank was shaped as required to position the geofabric. The upper bank batter was immediately revegetated in order to get cover on the erosion-prone surface.

In stage four, the first order stream needed to be positioned into its former channel in order to protect the film set structure and nearby road, and allow for the rehabilitation of a newly formed gully system.

Four main components were proposed:

  • Rock revetment of the right bank at and downstream of the film set
  • The construction of a log training wall to re-establish the right bank commencing at the avulsion breakout point
  • Revegetation of the right bank to secure the creek’s position in the longer term
  • Backfilling of the gully system with bed material (gravel and cobbles) that had accumulated within the nearby Trials Lake on Dungary Creek

The revetment work was constructed by Total Environmental Concepts using graded quarry rock with a geofabric underlay. The rock was carefully placed with existing large boulder worked into the structure.

The creek had broken out of its natural course and severely eroded the outer creek surrounds. The work detail was for the use of rocks to protect the embankment and build a log wall to redirect the creek to erode in natural course.

Total Environmental Concepts’ plan required logs to be recessed into a shallow trench with logs driven into creek beds on both sides and then bolted together under tension, allowing the deflection of water back into the centre of the creek.

The outside of the creek bed was lined with geofabric fill. Material and soil was added to revegetate and reinforces the outside of the bed.

Contact Total Environmental Concept today to discuss how our rebuilding and revegetation services can help you.

Recent Projects

News

DustChek Awarded Bright Spot Award By BHP

In the realm of innovations that drive positive change, This accolade celebrates initiatives that go above and beyond, and one such luminary recipient is DustChek, a pioneering solution in the realm of dust control. As we explore the story behind this prestigious...

News
forestry mulcher hire

Commercial Acreage Slashing And Maintenance

Total Environmental Concepts provides a range of skilled mowing and maintenance services for a range of industries across Queensland, including Brisbane, the Gold Coast, and Sunshine Coast. We work across local government assets, sporting grounds and commercial...

News
commercial slashing services

3 Reasons For Commercial Slashing

When it comes to maintaining commercial acreage or development sites, there are many reasons for why you should make sure to maintain your property with commercial slashing. Of course, every project is different and has individual requirements and deliverables, but...

News
forestry mulching

Vegetation Management and Erosion Control

Managing large scale properties for vegetation management and erosion control can be a large task. It requires knowledge and the use of specialised equipment to manage vegetation and control erosion for conservation purposes. The team from Total Environmental...

News

What’s Involved In Land Clearing

When looking to get commercial or acreage clearing Brisbane there are several steps that must be considered to ensure that the land is created efficiently and properly with the best result.  At Total Environmental Concepts, doing the job properly is...

News

Understanding Total Environmental Concepts.

Total Environmental concepts is a Brisbane environmental services company that specialises in fire track and trail construction, stormwater management and biobasin maintenance, and a variety of other key services for councils and commercial project managers. As...

News

Can You Relocate An Established Tree

If there is an established tree on your commercial property that needs to be moved before construction can begin then yes, it can be relocated. At Total Environmental Concepts, we work with councils, developers, and landscapers to ensure that your project can move...

News
acreage clearing brisbane

Firebreaks and Slashing

If you own a property or manage a commercial property, we can provide firebreak and slashing services to help manage the property and protect surrounding structures. This is an important service that is often scheduled throughout the year to ensure properties and...

News

Fire Management Plan 2020-21

Despite the current extreme wet weather, the Australian summer will come about. As we’ve seen in the past year, severe bushfires have decimated large areas of the country, causing significant damage to bushland, homes and lives. Now is the time to assess your...

localbuy pre-qualified supplier
redland council environmental services
scenic rim council environmental projects
logan city council preferred environmental consultants
Queensland Parks & Wildlife rehabilitation

CONTACT
TOTAL ENVIRONMENTAL CONCEPTS

environmental rehabilitation

ENVIRONMENTAL REHABILITATION

Hydroseeding

HYDRO MULCHING & SEEDING

stormwater management brisbane

STORMWATER MANAGEMENT

track trail construction brisbane

TRACK AND FIRE TRAIL CONSTRUCTION

bioretention basin management brisbane

BIORETENTION BASIN MANAGEMENT

land management brisbane

LAND MANAGEMENT